The Lucknow Sentinel, 1985-11-06, Page 4I Page 4—Lucknow Sentinel, Wednesday, November 6, 198,5
1=1221b. ACM=
Ontario
IN THE MATTER OF the Consolidated Hearings Act:1981. IS 0 1981,
P c 20).
ANO IN THE MATTER OF the Envuonmertal Assessment Act (R S O
1980.c 140). ,
AND IN THE MATTER OF Sections6 7 and.8, of the Expropriations Act
(RSO1980.c•148).
AND 'IN. THE MATTER OF the Niagara Escarpme.nt ;Planning 'and '
,Development Act (R 5 0 1980,.c 316), ,
AND IN THE MATTER OF the Parkway Belt Planning and Development
Act. (RSO 1980. c;268). •
AND IN THE MATTER OF an undertaking of Ontario Hydro consisting of
the acquisition, of properly rights for, and the, design construction
operation and Maintenance ofoverhead alternating current Iransm ss nn
Ines, and related station. communication and control facilities, located
wffhin a geographic area. (identified on the study area map ,nuuded .n
this nonce) ••
Between th'e Bruce Nuclear Power, Development hear Kincardine
and the Essa Transformer Station near Barrie
Between the Bruce Nuclear Power Development and a new trans.
former station to be built in the Lond.pn area and
Between the new transtormer station in the, London area and the
Nanticoke Generating Station on Lake Ere
A
NOTICE OF PUBLIC HEARING AND
COMMENCEMENT OF MAIN HEARING
ONTARIO HYDRO TRANSMISSION SYSTEM
EXPANSION PROGRAM
THE JOINT. BOARD IS CONPUCTING A PUBLIC HEARING TO CONSIDER, THE •
APPROVAL OF. AND IF APPROVED,.THE LOCATION•OF ONTARIO HYDRO'S
•PROPOSED TRANSMISSION FACILITIES BETWEEN • •
THE BRUCE NUCLEAR POWER DEVELOPMENT, NEAR KINCARDINE, AND THE
• ESSA TRANSFORMER STATION, NEAR•BARRI.E, • •
• • THE BRUCE NUCLEAR, POWER DEVELOPMENT ANDA NEW TRANSFORMER
STATION TO BE BUILTIN THE LONDON AREA AND •
•
THE NEW TRANSFORMER STATION IN THE LONDON AREA AND THE
NANTICOKE GENERATING STATION, ON LAKE ERIE
AND TAKE NOTICETHAT IF YOU DO NOT ATTEND AT THE HEARING. THE JOINT
BOARD MAY PROCEED WITH THE HEARING, IN YOUR ABSENCE AND YOU WILL
NOT BE ENTITLED TO ANY FURTHER NOTICE IN THE PROCEEDINGS.
AND TAKE NOTICE THAT YOUR LAND MAY BE EXPROPRIATED FOR ANY
•FACILITIES WHICH MAY BE APPROVED
• Ontario Hydro is proposing a major expansion of its bulk electricity
transmission system. This would involve constructing new transmis-
sion lines, a new London area transformer station and related facilities,
The recommended location and alternative locations are shown on the. •
. map in.this,notice.
Study Area Map
The shaded area on this map shows the approximate study area
Lake Huron
•Port•Elgin
Bruc
NPD
Kincardine
Godench
Bayfield
Ailsa Crai
Strathroy
SiteN
401
Chatsworth
iove
T irfrailover
Walkerton
✓ ' Wingham
• Clinton '
1
i
t►
Exeter
London,/
Georgian
Bay
Colli
gw
•
od /1
Essa TS
• y�! ,,,1 ,w. Iliston
1r
Guelph
0
Kitchener • r• .
M
i Cdge
rtilsonbtog
St. Thomas
401.
on TS
ddleport TS
Si Nantic
•
.Lake Err'r
•
e
Port Dover
rl�
Site N
Recommended Site
for the new London
area Transformer
Station
•Legend
£ GS, Generating Station
■ TS Transformer Station
NPD Nuclear Power Development
Study 'Area
Recommended Route
Acceptable Alternative Routes
C •.1
THE JOINT BOARD MAY CONSIDER FOR APPROVAL THE RECOMMENDED LOCATION OR
' ANY OF"THE ALTERNATIVE LOCATIONS OR'ANY OTHER LOCATIONWITHIN THE STUDY
,AREA. THE DECISION RESULTING FROM ;THIS HEARING WILL DETERMINE THE LOCATION
OF ANY TRANSMISSION LINES. THE NEW LONDON AREA TRANSFORMER STATION. AND
OTHER FACILITIES WHICH MAY BE APPROVED, AND YOUR LAND MAY BE E$PROPRIATED
FOR THESE FACILITIES AS A RESULT OF THE JOINT BOARD'S DECISION.
TIME AND PLACE OF THE MAIN HEARING
Please note the rescheduled date .
the main hearing,will commence:
AT: Guelph Holiday Inn, 601 Scottsdale Road, Intersection
of •Highway 6 north and Stone Road, Guelph, Ontario
ON: WEDNESDAY, NOVEMBER'13;1985
AT: 10:30 a.m. •
•
at w,hich time the Joint Board will deaf with any outstanding preliminary
and procedural matters and immediately thereafter will continence to'
' hear the evidence of Ontario Hydro.
N9
The Joint Board will also be scheduling hearings for the convenience
of the public at Markdale, Clinton, London'and Simcoe. Dates and
times will be announced'at a future date and -a newspaper notice will
be published.
Ontario Hydro's evidence on transmission routes and transformer
station locations will be given at the respective local hearings. All other
Ontario Hydro evidence will be given in Guelph.
if you wish to make a submission at one of these locations, please'clip
out and send ih the coupon in this notice to:
Yvonne Fernandes
Hearings Registrar, ••
Office of Consolidated Hearings ' ;
1 St. Clair Avenue West .
5th'Floor '
Toronto, Ontario •
M4V1K7
•
If you send in the coupon, you will be mailed further notice of -the local
hearings.
r.
1.
HEARING REGISTRATION FORM
To assist the Joint Board in making the publicparticipation at.this
hearing s convenient as possible, please indicate: . .
1'. Do you wish to make a subriiission to the Board?
YES.DI NQ ❑.' .
IF YES, have you already„ indicated. to the Board your
intent to.do so?.
YES ❑ NOD �.
2: How much time do you estimate youwould need to.
make your submission? •
minutes
3. -Please indicate whereyou wish to make your 1
submission.'
,Guelph ❑ London ❑
Markdale 0. • Simcoe C] ,
Clinton ' 0
4. I do not wish to make a submission, but would like to obtain a •
copy of the Joint Board's final decision, ❑
Name:
Address: •-
Teiephone (Day)
, ,.(Evening)._
•
Hearing No. CH -85-03 Yvonne Fernandes
Hearings Registrar
Office of Consolidated Hearings
1 St, Clair Avenue West
5th Floor
• Toronto, Ontario
Dated at Guelph M4V1K7 • '
this 17th day of October,1985 (416) 965-2531; '
1
•