HomeMy WebLinkAboutThe Lucknow Sentinel, 2015-10-14, Page 9Town and
Country Bowl
Submitted
Monday, September 28, 2015
Scores over 200: Anita Elliott 205,
Charles Green 215
Ladies High Single: Anita Elliott 205
Mens High Single: Charles Green 215
Ladies High Triple: Anita Elliott 519
Mens High Triple: Charles Green 515
Tuesday, October 6, 2015
Team Standings: Team 4-4, Team
2-3, Team 1-1, Team 3-0
Ladies High Single: Janelle Gurr 206
Mens High Single: Charles Green 207
Ladies High Triple: Janelle Gurr 587
Mens High Triple: Emerson
Howald 576
Carter's
Crokinole Report
Peter Carter
An evening of fun and fellowship
while playing crokinole was enjoyed on
Wednesday, October 7 at the Scone
School House.
First place for the men was shared by
Al Carter and Peter Carter with a score
of 48 followed closely by Clare Kuepfer
with 46 and in third place was Jack
MacLeod with 32 points. Al also took
top spot in the twenties category with
47, second place went to Clare with 37
and Peter claimed third with 32.
On the ladies side top score went to
Donna Caughy with 40 points second
was Doreen Sulkye with 35 and Shar-
mane Carter and Jo -Ann Carter tied for
third with 32 points. Doreen topped the
twenties count with 27 Jo -Ann placed
second with 22 and third was a two way
tie between Janet Diebel and Amelia
Hartman with 21.
Door prizes were won by Amelia,
Donna and Jo -Ann.
October 21 will be our next evening of
crokinole beginning at 7:00 p.m.
if you bairn yourself,
run (001w01011 air iFie
mud for mord Hibor.
Wednesday, October 14, 2015 • Lucknow Sentinel 9
EPCOR UTILITIES INC.
NOTICE OF STUDY COMMENCEMENT AND PUBLIC INFORMATION SESSION
PROPOSED NATURAL GAS PIPELINESTO SERVE SOUTHERN BRUCE COUNTY
The municipalities of Arran-Elderslie, Kincardine and Huron -Kinloss (the "Municipalities")
in Southern Bruce County,Ontario, and EPCOR Utilities Inc. ("EPCOR") invite the public to
attend information sessions to learn more about the proposed natural gas utility project.
EPCOR is proposing to build:
• A natural gas distribution network in the communities of Southern
Bruce County, with a total length of approximately 145 kilometres (km).
• A natural gas pipeline transmission segment from Wingham Meter
Station to Bruce Industrial Park by way of Ripley and Kincardine.
This will consist of approximately 75 km of Nominal Pipe Size (NPS)
8 -inch steel extra high pressure (XHP) pipeline.
• A natural gas pipeline transmission segment from Dornoch
Meter Station to Paisley by way of Chesley. This will consist of
approximately 35 km of NPS 4 -inch XHP pipeline.
A preliminary location and study area of the proposed distribution network
and natural gas transmission pipelines is identified on the map but is
subject to change dependant on consultation and route optimization.
As part of the planning process, EPCOR has retained Stantec Consulting
Ltd. ("Stantec") to undertake an environmental study of the construction
and operation of the natural gas pipelines (the "Environmental Study").
Bruce Industrial
Park
Lake
Huron
Lurgan
Beach
Point
Clark r
Tiverton
„
Kincardine
Meter
Paisley Station
,••
Chesley••
Legend ,caRudp
_ e � Transmission
maw cm Phasezo=;reu,,onn
=Phase 3 Dmrlbuaon
0 Meter Station
q , ,km
The Environmental Study will fulfill the requirements of the Ontario Energy Board's (OEB) "Environmental Guidelines
for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario, Sixth Edition (2011)':
The current schedule provides for completing the report for the Environmental Study in the spring of 2016, after which
EPCOR will file an application for the proposed distribution network and natural gas transmission pipelines with the OEB.
Under Section 90 of the Ontario Energy Board Act, the OEB's review and approval is required before the project can
proceed. If approved, construction of the pipelines is currently expected to begin no earlier than Q1 2017
The Environmental Study process will include consultation and engagement with landowners, Aboriginal communities,
government agencies and other interested persons. Public consultation is an integral component of the Environmental
Study and related report. Three Information Sessions followed by a presentation are being held for the public to learn
more about EPCOR and the proposed project. The Information Sessions will be held as follows:
Thursday, October 15th, 2015
Chesley Community Centre
129 4th Avenue South East,
Chesley, Ontario
6:30 p.m. to 9:00 p.m.
Presentation: 7:00 p.m.
Friday, October 16th, 2015
Ripley -Huron Community Centre
Upstairs Auditoriuml7 Queen Street,
Ripley, Ontario
Saturday, October 17, 2015
Kincardine Municipal Administration Centre
Public Hall 1475 Concession 5, RR #5,
Kincardine, Ontario
5:00 p.m. to 8:00 p.m. 1:00 p.m. to 4:00 p.m.
Presentation: 7:00 p.m. Presentation: 1:30 p.m.
Representatives from the Municipalities, EPCOR and Stantec will be available to explain the project and answer questions
regarding routing, design and scheduling. Input received will be used to confirm both the existing environmental conditions
and the preliminary preferred pipeline route and to develop site specific protection or mitigation measures for the project.
To learn more about the proposed project you can visit EPCOR's Southern Bruce County Natural Gas Utility Project webpage
at www.epcorsouthernbruce.com. For any additional questions or comments regarding the Environmental Study or the pro-
posed project please do not hesitate to contact the following:
Rooly Georgopoulos
Senior Project Manager
Stantec Consulting Limited
300-675 Cochrane Drive, West Tower,
Markham, ON L3R OB8
Phone: (905) 415-6367
Email: rooly.georgopoulos@stantec.com
Andrew Laycock
Specialist, Public Consultation
EPCOR Utilities Inc.
Suite 2000 10423-101 St.,
Edmonton, ABT5H 0E8
Phone: (780) 412-3873
Email: alaycock@epcor.com