The Huron Expositor, 1985-11-06, Page 16A16 -- THE HURON EXPOSITOR, NOVEMBER 6, 1985
laraculr
Ontario
IN THE MATTER OF the Consolidated Hearings Act, 1981, (5.0. 1981,
c. 20);
AND IN THE MATTER OF the Environmental Assessment Act, (R.S.O.
1980, c. 140);
AND IN THE MATTER OF Sections 6, 7 and 8 of the Expropriations Act,
(R.S.O. 1980, c. 148);
AND IN THE MATTER OF the Niagara Escarpment Planning and
Development Act (R.S.O. 1980, c. 316);
AND IN THE MATTER OF the Parkway Belt Planning and Development
Act, (R.S.O. 1980, c. 368);
AND IN THE MATTER OF an undertaking of Ontario Hydro consisting of
the acquisition of property rights for, and the design, construction,
operation and maintenance of overhead alternating current transmission
lines, and related station, communication and control facilities, located
within a geographic area (identified on the study area map included in
this notice):
Between the Bruce Nuclear Power Development, near Kincardine
and the Essa Transformer Station, near Barrie;
Between the Bruce Nuclear Power Development and a new trans-
former station to be built in the London area; and
Between the new transformer station in the London area and the
Nanticoke Generating Station, on Lake Erie.
NOTICE OF PUBLIC HEARING AND
COMMENCEMENT OF MAIN HEARING
ONTARIO HYDRO TRANSMISSION SYSTEM
EXPANSION PROGRAM
THE JOINT BOARD IS CONDUCTING A PUBLIC HEARING TO CONSIDER THE
APPROVAL OF, AND IF APPROVED, THE LOCATION OF ONTARIO HYDRO'S
PROPOSED TRANSMISSION FACILITIES BETWEEN:
THE BRUCE NUCLEAR POWER DEVELOPMENT, NEAR KINCARDINE, AND THE
ESSA TRANSFORMER STATION, NEAR BARRIE;
THE BRUCE NUCLEAR POWER DEVELOPMENT AND A NEW TRANSFORMER
STATION TO BE BUILT IN THE LONDON AREA: AND
THE NEW TRANSFORMER STATION IN THE LONDON AREA AND THE
NANTICOKE GENERATING STATION, ON LAKE ERIE.
AND TAKE NOTICE THAT IF YOU DO NOT ATTEND AT THE HEARING, THE JOINT
BOARD MAY PROCEED WITH THE HEARING IN YOUR ABSENCE AND YOU WILL
NOT BE ENTITLED TO ANY FURTHER NOTICE IN THE PROCEEDINGS.
AND TAKE NOTICE THAT YOUR LAND MAY BE EXPROPRIATED FOR ANY
FACILITIES WHICH MAY BE APPROVED.
Ontario Hydro is proposing a major expansion of its bulk electricity
transmission system. This would involve constructing new transmis-
sion lines, a new LOII.iOn area transformer station and related facilities.
The recommended location and alternative locations are shown on the
map in this notice.
Study Area Map
The shaded area on this map shows the approximate study area.
Lake Huron
Port Elgin
Bruc
NPD
Kincardine
Goderich
Bayfield
Ailsa Cra
Strathroy
Chatsworth
anover
Walkerton
Wingham
Clinton
Exeter
London
Site N
401
Georgian
Bay
Colli r gw1 od
Essa TS
Iliston
me
Guelph M
•
Kitchener
•
e
401
n TS
iddleport TS
Nantic • e
ittfiont3u%St, Thoveta
Port Dover
Lake Erie
Site N
Recommended Site
for the new London
area Transformer
Station
Legend
A GS Generating Station
■ TS Transformer Station
NPD Nuclear Power Development
Study Area
Recommended Route
Acceptable Alternative Routes
THE JOINT BOARD MAY CONSIDER FOR APPROVAL THE RECOMMENDED LOCATION OR
ANY OF THE ALTERNATIVE LOCATIONS OR ANY OTHER LOCATION WITHIN THE STUDY
AREA. THE DECISION RESULTING FROM THIS HEARING WILL DETERMINE THE LOCATION
OF ANY TRANSMISSION LINES, THE NEW LONDON AREA TRANSFORMER STATION, AND
OTHER FACILITIES WHICH MAY BE APPROVED. AND YOUR LAND MAY BE EXPROPRIATED
FOR THESE FACILITIES AS A RESULT OF THE JOINT BOARD'S DECISION.
TIME AND PLACE OF THE MAIN HEARING
Please note the rescheduled date
The main hearing will commence:
AT: Guelph Holiday Inn, 601 Scottsdale Road, Intersection
of Highway 6 north and Stone Road, Guelph, Ontario
ON: WEDNESDAY, NOVEMBER 13,1985
AT: 10:30 a.m.
at which time the Joint Board will deal with any outstanding preliminary
and procedural matters and immediately thereafter will commence to
hear the evidence of Ontario Hydro.
The Joint Board will also be scheduling hearings for the convenience
of the public at Markdale, Clinton, London and Simcoe. Dates and
times will be announced ata future date and a newspaper notice will
be published.
Ontario Hydro's evidence on transmission routes and transformer
station locations will be given at the respective local hearings. All other
Ontario Hydro'evidence will be given in Guelph.
If you wish to make a submission at one of these locations, please clip •
out and send in the coupon in this notice to:
Yvonne Fernandes
Hearings Registrar
Office of Consolidated Hearings
1 St. Clair Avenue West
5th Floor
Toronto, Ontario
M4V 1K7
If you send in the coupon, you will be mailed further notice of the local
hearings.
r
HEARING REGISTRATION FORM
To assist the Joint Board in making the public participation at this
hearing as convenientaspossible, please indicate:
1. Do you wish to make a submission to the Board?
YES ❑ NO ❑
IF YES, have you already indicated to the Board your
intent to do so?
YES ❑ NO ❑
2. How much time do you estimate you would need to
make your submission?
minutes
3. Please indicate where you wish to make your
submission.
Guelph ❑ London 0
Markdale 0 Simcoe ❑
Clinton ❑
4. I do not wish to make a submission, but would like to obtain a
copy of the Joint Board's final decision. 0
Name:
Address:
Telephone (Day)
(Evening)
Hearing No. CH -85-03 Yvonne Fernandes
Hearings Registrar
Office of Consolidated Hearings
1 St. Clair Avenue West
5th Floor
Toronto, Ontario
Dated at Guelph M4V 1K7
this 17th day of October, 1985 (416) 965-2531