Loading...
HomeMy WebLinkAboutThe Times Advocate, 2005-04-06, Page 88 Exeter Times–Advocate Wednesday, April 6, 2005 It was no April Fool's joke as students donned outrageous hats at Exeter Public school to raise $500 for Jesse's Journey and Duchenne Muscular Dystrophy. In order to wear a hat all day long, participating staff and students had to donate $2 to the cause. In the front row, left to right, are: Spencer Parkinson, Michelle Keys, Robyn Brand, Denver Homuth, Kaz Budny, Cheyenne Duskey and Adrian Timmermans. In the middle row, starting at left, are: Angela VanDerLey, Emily Hartman, Trevor Skochinski, Ashley Northcott and Cassie Eveland. In the back row, from left to right, are: Alexandra Timmermans, Taylor Obve, Mrs. Ruth Ann Dean and BrittneyVandergunst. (photo/Stephanie Mandziuk) Hurondale WI attends tea party By Bev Campbell EXETER — On Wed., March 30, 13 members of Hurondale Women's Institute (WI) and three guests, donned spring hats and gloves, and attended a traditional afternoon tea party at the home of Fern Dougall. After a lovely tea lunch, the tea leaves were read by Dougall, accompanied by a lot of laughs. Dougall also gave a thorough history of tea. Following the social time, the business meet- ing was open by presi- dent Marion Frayne with the Institute Ode and the Mary Stewart Collect. The roll call was answered by the mem- bers and guests telling the origin of the cup and saucer they brought for show and tell. The guests were intro- duced and district presi- dent Joan Smith and sec- retary Donna Lovie were given a gift of potted spring tulips. The invitation from Grand Bend WI to attend their edu- cation event April 7 was discussed as well as their Grand River Cruise on June 16. The board meeting is April 4 and the district annual is May 19 with Crediton as hosts. The Hurondale annual bake sale will be held Thurs., July 14 dur- ing the Exeter sidewalk sales. The business being con- cluded, the programme was turned over to Lorraine Alexander's group and she gave out some interesting facts on tea. Laura Sillery also gave a reading and then Marilyn Pym demonstrat- ed some fancy napkin folding techniques. Tea was served along with sweets to end the after- noon. The next meeting will be the annual meeting at Alexander's Wed., April 27. NOTICE Fire Hydrant Flushing The Municipality of South Huron, will be flushing fire hydrants for a 3 -week period starting the Week of April 3, 2005. If you experience cloudy or discoloured water, please run your taps until they flow clear. This is not a health hazard. Your co-operation and patience is appreciated. SUMMIT SUMMIT Landscaping is a full service landscape design, TREE FARM & instalationmaintenance firm We ofernd a full array of LANDSCAPING Se aic ndes to fit s aping all odsour COMMERCIAL & RESIDENTIAL LANDSCAPING i(NEW TREE SPADE Landscape Design • Landscape Installation • Landscape Maintenance • Topsoil • Landscape Materials • Rocks • Stone Work • Paving Stone • Vinyl & Wood Fencing • Stamped Concrete • Garden Ornaments • Tree Spade • Large Tree Removal or Relocation • Bed Edging; Mulching; Planting Division • Relocation; Weeding CALL US FOR ALL YOUR LANDSCAPING NEEDS 519-229-6730 - Lisa or 519-857-9350 - Jeff (cell) E-mail: summit@quadro.net James says ... Deacon Flooring has expanded to serve Grand Bend and area! The leader/n... SHOP AT NOME DOUG SMAILL 521-4217 in Grand Bend & area Specializing in: • Carpet • Durafloor • Vinyl • Hardwood • Ceramic • Area Rugs • Laminates DEACON ''�l LN_l:l Completely installed With Premium Padding!! (up to 216 sq. ft.) LOOKING Shop At Home 870 -RUGS (7847) 1700 HYDE PARK ROAD EXCLUSIVE SHOP AT HOME SERVICE (just North of Gainsborough) LONDON COUNTY OF HURON CLASS ENVIRONMENTAL ASSESSMENT, SCHEDULE B BRIDGE REHABILITATIONS 1ST MANDATORY PUBLIC CONTACT - PHASE 2 NOTICE OF STUDY COMMENCEMENT The County of Huron has initiated the repair of a number of county bridges. The scope of the repairs will be defined during the course of the project. The project is being planned under Schedule B of the Municipal Class Environmental Assessment. The bridges being studied include the following: 1) Bannockburn Bridge, Bannockburn River, County Road 3, 2.2km east of Varna, Municipality of Bluewater, Geographic Township of Stanley, Concession BRN-BRS, Lot 24 2) Bonney Brook Bridge, Maitland River, County Road 22, 6.4km north of Auburn, Twp of North Huron/ Twp of Ashfield-Colborne-Wawanosh, Geographic Township of Wawanosh, Concession V -VI, Lot 27-28 3) Becker's Bridge, County Road 1, 5.7 km north of County Road 20, Twp of Ashfield Colborne-Wawanosh 4) Egmondville Bridge, Bayfield River, County Road 12, 0.01 km south of Egmondville, Municipality of Huron East 5) Grieves Bridge, Maitland River South Branch, County Road 12, 4.0 km north of Seaforth, Municipality of Huron East, Geographic Township of McKillop, Concession IV, Lot 25 6) Zetland Bridge, Maitland River, County Road 86, 3.4 km west of County Road 4, Twp. Of North Huron/Municipality Of Morris-Turnberry 7) South of Wingham Bridge, Middle Maitland River, County Road 4, 0.5 km south of County Road 86, Twp. Of North Huron/Municipality Of Morris-Turnberry 8) Crediton Bridge, Ausable River, County Road 10, 2 km east of Parr Line (Crediton), Municipality of South Huron 9) Molesworth Bridge, Maitland River, County Road 86, 3.8 km east of County Road 12, Municipality of Huron East/ Twp. Of Howick 10) Boundary Bridge 26, Tributary of the Ausable River, Line 17, 1.5 km west of County Road 11, Municipality of South Huron/ County of Perth 11) Boundary Bridge 4, Tributary of the Maitland River, Line 172, 0.8 km south of County Road 86, Municipality of East Huron/ County of Perth, Geographic Township of Grey, Concession I, Lot 70 For further information on this project, please contact Mr. Scott Davis, Totten Sims Hubicki Associates, 72 Victoria St. S. Suite 202, Kitchener, Ontario, N2G 4Y9. Public input and comment will be invited for incorporation into the planning and design of this project. Subject to comments received and the receipt of necessary approvals, the County of Huron intends to proceed with the planning, design and construction of this project to be com- pleted by late 2005. This notice issued April 6, 2005. County Engineer, Donald W. Pletch County of Huron 1 Courthouse Square Goderich, ON N7A 1M2