HomeMy WebLinkAboutTimes-Advocate, 1986-04-02, Page 17•
Times -Advocate, April 2, 1986
P
MA Fit.: Cw-83.03
! '
PROPOSED WATER WORKS R TWO BAST LAMWTON ARIA WATER SUPPLY SYSTEM
IN THE MATTER OF Sections 2 8 3 ofaf ond — (CO. )1981, c. 20)
IN THE MATTER OF Section 43 of The Ontario Water R.sgurces Act (R.S.O. 1980, c.361, as amended).
IN THE MATTER OF Section 64 of The Ontario Mk1e d Acj (R.S.O. 1960, c.347)
IN THE MATTER OF Sections 210 (paragraph 51) and 21a8n'oof The Municj of Act (R.S.O. 1980, c.302, as emended)
—and—
TAKE NOTICE that the Councils of the following Corporations acting lointly:
Township of Sarnia Village of Wyoming
Town of Forest Township of Plympton
Village of Watford
have made applkation under Sections 2 and 3 of the Consolidated Hearings Act for approval of the planning design and construction of water -
mains on certain municipal rood allowances within such municipalities which comprise the Eost Lambton Are" Water Supply System of a total
cost of $23,650,500.00 involving the consideration of certain by-laws authorizing the construction of wotermoins, the imposition of water works
rates and connection charges, and the entering into of agreements to provide for the development and operation of on area water scheme
by The Ministry of the Environment.
AND TAKE NOTICE THAT further and in odditon to all of the matters to be considered by the Joint Board in the Notice of Hearing doted January
16, 1986, the Joint board will also receive evidence and make o decision regarding the Corporation of the Township•of Warwick's intention to
finance part of•the cost of its participation in and the cost of construction associated with the Eost Lombton Area Water Supply System through
the imposition of a woter works rate upon the owners or occupants of the lands which front or abut the streets or part of streets described
herein or who connect to the watermains constructed thereon. The said streets are more particularly described as follows:
IQ
Bear Creek
Road between Lots 12 &
13
Highway 7
153 m north of Egremont
Road
122 m south of Highway 7
Egremont Road
Mereden Street
Elizabeth Street
Digby Street
305 m west of line bet-
ween lots 10 & 11
Highway 79
North Village Limits of
Watford
260 m south of William
Street (William
Subdivision)
138 m west of
Township of Bosonquet,
and the Township of Warwick.
iel
. tits wN-'.
AN EASTER WALK — Enjoying a stroll along Exeter's Main street
at noon Sunday was Heather Peters. T -A photo
Debate the future
of Auburn bridge
Anyone interested in the fate of the
picturesque and historic Ball's Bridge
near Auburn will have an opportuni-
ty to obtain full information and to
discuss the entire reconstruction pro-
ject at a public meeting on April 11,
1986 at 8 p.m. in Auburn Community
Hall.
In a report presented to Huron
County Council on March 27, the coun-
ty road committee "felt it was time
that the public were given the oppor-
tunity to understand the county's ac-
tion and provide some input into the
proposed alternatives."
For some time, there has been con-
siderable controversy concerning the
construction of a new bridge and the
future of the existing one. Presenting
the committee's report and recom-
rftendatiane, Colftorne-.•'F"wnBhlp
Reeve, Russel Kernighan, pointed out
that, in addition to financial and
engineering considerations, there are
many other implications, and "op-
position to removing the existing
bridge goes outside our boundaries."
As one of the last remaining
"wrought iron pinned" structures, the
historic Ball's Bridge has attracted
the attention of the Ministry of
Culture and Citizenship and other
heritage-mjnded groups and
individuals.
For these reasons, the county road
committee decided to treat the two
questions as separate items: 1. Where
to build a new bridge up to provincial
standards'! 2. What action should be
taken to retain the existing Ball's
Bridge for public access as well as for
preservation or heritage?
According to Reeve Kernighan, the
new bridge is expected to be started
next year. The estimated cost is one
and a quarter million dollars of which
eighty per cent would be paid by the
provincial government. If im-
provements to the access roads are
included, the total cost of the project
would amount to approximately two
million dollars.
As to the existing Ball's Bridge, the
county council approved the commit-
tet's; tet'ommertdatlon that this
bridge "remain as a county bridge,
open to traffic at the existing stan-
dard for a maximum period of ten
years." This decision is subject to two
conditions: that the bridge will not be
replaced, if it is excessively damag-
ed or destroyed by natural causes,
and that at the end of the ten-year
period the situtation will be review-
ed to determine whether a further ex-
tension could be recommended or
whether the bridge should be closed
to any traffic and possibly removed.
Highway 21 (County Rd. #8)
Bear Creek
Highway 21
Highway 7
Egremont Road
Highway 7
Highway 7
Highway 7
Guy Street
Line between Lots 10 & 11
Highway 7
Rood between Concessions 2 & 3 "SER"
William Street
(William Subdivision
Highway 7
DAL
Highway 7
Highway 7
Egremont Rood
Park Street
George Street
Guy Street
Digby Street
Alma Street
Mereden Street
Elizabeth Street
Rood between Concessions
2 & 3 "SER"
Highway 79
Kelly Street
(William Subdivision)
William Street
(William Subdivision)
County Rood #8 "existing 200 Road between Concessions
millimeter water line" 4 & 5 "SER"
And Take Further notice that the Special Water Rotes for the Township of Warwick are
Type of Rata Annual Charge IArID_
$517.05 per lot basis 5 years
3 mills 4 years
Frontage Rate
Mill Rote
EXAMPLE OF A TYPICAL HOME CHARGE
The following is an example of the annual charge of a typical dwelling property:
The property fronting on the proposed works or using the sytem:
Township of Warwick
- water works rote
- water service rate
- connection charge
- mill rate (3 mills)
Highway 7 ,
West Limit of Village
of Watford
as follows:
Commuted Charge
$1,800.00
N/A
i
$517.05 •
$150.00
$114.90
$15.00 on on
assessment of $5,000.00
$1,800.00
N/A
$400.00
N/A .
Total Annual Charge $855.95 $2,200.00
NOTICE OF RESUMPTION OF HEARING
TAKE NOTICE THAT THE hearing before the Joint Board which commenced on Monday, February 24, 1986, will resume on THURSDAY, the 10th
day of APRIL, 1986 at 10:00 a.m. at the Township Municipal Offices at 2109 London Road in the Township of Sarnia.
AND TAKE NOTICE THAT if you do not attend or be represented at the hearing, the Joint Board may proceed with the hearing in your absence
and you will not be entitled to any further notice in the proceedings. Submissions may be mode in person at the hearing, either orally or in
writing. The Board will not consider any submissions regarding the proposal after the hearing has been closed.
AND TAKE FURTHER NOTICE that his Notice is given for the purpose of providing additional supplemental information and particulars with respect
to the Notice of Hearing issued by Yvonne T. Fernandes, Hearings Registrar, Office of Consolidated Hearings, on the 16th day of January, 1986.
Copies of all relevant material pertaining to this undertaking are available for examination during normal business hours in the office of the
Clerks of the Township of Sarnia, the Town of Forest, the Village of Watford, the Village of Wyoming, the Township of Plympton, the Township
of Bosanquet, the Township of Warwick and in the Office of Consolidated Hearings, 5th floor, 1 St. Clair Avenue West, Toronto, Ontario.
DATED AT TORONTO, Ontario this 11th day of March, 1986.
Yvonne. T. Fernandes
Hearings Registrar
Office of Consolidated Hearings
PROPOSED SECONDARY WATER DISTRIBUTION SYSTEM
rHAMLETk-OR•-'4ffiRWICIQ.., • •
! "1"144,.
NOTICE OF
PUBLIC MEETING
'-.The Huron County Road Committee invites the
general public to a meeting to introduce and consider
alternatives for the:
RECONSTRUCTION OF BALL'S BRIDGE
at the Auburn Memorial Hall at:
8:00 p.m. April 11, 1986
Please contact the undersigned for further details.
R.A. Dempsey, P. Eng.,
Huron County Engineer
Township of Hibbert
and Police Village Dublin
Opening of Land Fill Site
Commencing Saturday April 5th, 1986 The
Township Land Fill site situated at Lot 22 Concession
9, will be open from 9 a.m. to 5 p.m., every Satur-
day, until further notice. No car bodies, building or
concrete materials or fencing.
Patricia Taylor
D/Clerk, Township Hibbert
STEPHEN TOWNSHIP
Township of Stephen
CONSTRUCTION
TENDER
Sealed tenders clearly marked as to contents. will be receiv-
ed by the undersigned until 5:00 p.m. local time, Monday, April
14, 1986 for the supplying, loading, hauling and spreading of
cloy, B grovel and A gravel on the construction site of Conces-
sion 10.11, in the Township• of Stephen.
All tenders must be submitted on Township Tender Forms and
are available at the Township Office or Shed in Crediton.
A certified cheque in the amount of 10% of the tender price
must accompany each tender.
Lowest or any tender not necessarily accepted.
Eric Finkbeiner
Road Superintendent
PA. Box 100
CREDITON, Ontario
NOM IMO
(519) 234-6461
l!e*NO
•.
ammo IMMMAY
~TV eeM
Orme eoa•
I
NASA
w
:
•
I
WOE III/ION
IMINS101111 Wye
NA". 1
EAST ISTON
AREAS
SUPPLY
LEGEND
s>nsrvre
• MA1rra•MA
AA .
rri r r0. -0-.r1
Irk N
PROPOSS0
WORKS
E
VS MOO arrow. WOW WW1
toll} mow.
L
LOT
:.9:
., LOT 10
i
r
W1/2
rlt
I
y"''WICK
ousIssnlemoshassir
.IF ••w .us•
missies ern ...were 01006001 I w.•.
00.040.. ..M.. I M.q. 0011110/101
jimempuggsgousaggilisaillialelli
r.rn. r r-
1'