Loading...
HomeMy WebLinkAboutLakeshore Advance, 2013-09-04, Page 8111. NORTHLAND POWER Wednesday, September 4, 2013 • Lakeshore Advance 7 P IEEGAJ\[BBURNSII)E Notice of Posting to the Environmental Registry by Grand Bend Wind Limited Partnership, with Northland Power Inc. as agent regarding a Proposal to Engage in a Renewable Energy Project Project Name: Grand Bend Wind Farm (the "Project"). Project Location: North of Grand Bond, in the municipalities of Bluewater and South Huron, Huron County. Portions of the transmission line also traverse the municipality of Huron East and the municipality of West Perth in Perth County. Dated at: West Perth, South Huron, Bluewater and Huron East this 4"' day of September, 2013. Grand Bend Wind Limited Partnership, by its general partner Grand Bend Wind GP Inc. and with Northland Power Inc. as agent, are planning to engage in a renewable energy project in which the issuance of a renewable energy approval is required. The Project is subject to the requirements of the Environmental Protection Act (the "Act") Part V.0.1 and Ontario Regulation 359/09 (the "Regulation"). On February 15th, 2013, an application for renewable energy approval of the Project (the "Proposal") was submitted to the Ministry of the Environment. The Proposal was posted on the environmental registry referred to in section 5 of the Environmental Bill of Rights, 1993 on August 28th, 2013. Comments in respect of the Proposal may be submitted to the Director through the Environmental Registry website at www.ebr.gov.on.ca, or by contacting the Senior Project Evaluator noted below. The registry number for the Project is 011-9928. The active comment period for the Project on the environmental registry is 45 days, ending on October 12` , 2013. Project Description: Pursuant to the Act and Regulation, the facility, in which this Project is to be engaged in, is considered to be a Class 4 Wind Energy Facility. If approved, this facility would have a total maximum nameplate capacity of 100 MW and consist of up to 48 wind turbines on privately owned leased lands. The Project also includes step-up transformers, electrical collection and transmission lines, a parts and storage (office / maintenance) building, a substation, and switchyard to connect to the Hydro One power line (provincial grid), as well as other ancillary facilities such as temporary construction areas and turbine access roads with culvert crossings, where required. The Project location is described in the map below. Documents for Public Inspection: Project documents in support of the Proposal have been issued for public review on the Project website at http://grandbend.northlandpower.ca. Printed copies are also available for viewing at the following locations: Municipality of West Perth 169 St. David Street, Mitchell, Ontario, NOK 1 NO Municipality of Bluewater 14 Mill Avenue, Zurich, Ontario, NOM 2T0 Municipality of South Huron 322 Main Street South, Exeter, Ontario, NOM 1S6 Municipality of Huron East 72 Main Street South, Seaforth, Ontario, NOK 1 WO Project Contacts and Information: To learn more or to provide comments regarding the Proposal, please contact: Study Area Nick Colella, Senior Project Evaluator Ministry of the Environment Operations Division Environmental Approvals Branch 2 St. Clair Avenue West, Floor 12A Toronto, Ontario, M4V 1L5 Phone: 416-212-3691 or 1-800-461-6290 Fax: 416-314-8452 Jim Mulvale, EH&S Northland Power Inc. 30 St. Clair Avenue West, 17th Floor Toronto, Ontario, M4V 3A1 416-962-6262 Lyle Parsons, Project Manager Neegan Burnside Ltd. 15 Townline Orangeville, Ontario, L9W 3R4 519-941-5331 Project Specific E-mail Address and Free Phone Telephone Hotline: grandbendwind ai neepanburnside.com 1-800-696-8093 -4( MO OS M Wind Turbine Study Area Transmission Line 1 • r • • << ' ,•= • < 1 �� 1.a < Grand -Bend • Switchyard I . ♦♦ ♦ ♦ �♦ ♦ • ♦ I ♦ •' ♦ ♦•♦ ♦ . oi Zur1ch- - ..w•...... +--p,♦ <` ..- ov.��-. _ jransform•r Sub -Station Bl ey4 atw ► Oaahwood South Huron Hay '1