NOTICE OF APPLICATION AND WRITTEN HEARING
GRAND BAND WIND LIMITED PARTNERSHIP APPLICATION FOR LEAVE
TO CONSTRUCT TRANSMISSION FACILTIES TO CONNECT A WINDFARM
GENERATION PROJECT TO THE ONTARIO TRANSMISSION SYSTEM
Ontario Energy
Hoard
EB -2013-0185
Commission
de I'cnergie
de ('Ontario
Grand Bend Wind Limited Partnership (the "Applicant") has filed an application with the Board, dated April 19, 2013, under sections 92 of the Ontario Energy Hoard Act, 1998. The Applicant is a limited
partnership constituted under the laws of the Piovince of Ontario. The Applicant general partner is Grand Bend Wind GP Inc. (the "Applicant General Partner") which is currently owned by Northland Power
Inc. The Applicant is constricting a I00 MW wind -powered electricity generation facility in the vicinity north of the Town of Grand Bend (the Generation Project") which is subject to an Ontario Power
Authority Feed -in Tariff contract. In order to connect the Generation Project to the Ontario transmission system, the Applicant is planning to constnict the following facilities which are the subject of this
Application:
• a substation which will step up the voltage of the Generation Project collector system from 34.5 kV to 230 kV;
• a 230 kV single -circuit underground transmission line, approximately 30 km in length, to connect the Generation Project to the existing Hydro One transmission system circuit 13231) located
approximately 3 km South East of Hydro One's Seaforth TS;
• a switching station at the point of connection with the Hydro One transmission system near Seaforth TS.
A map showing the location of the proposed facilities is included with this Notice. The transmission line is entirely contained within municipal road rights-of-way to minimize its impact on private property.
with the exception that some private property will be crossed at each end of the transmission line. The Applicant has acquired easements through the affected parcels of private land. The Transmission
Facilities will be owned by the Applicant and be paid for by the Applicant or its affiliates/partners. The Hoard has assigned file number EB -20I3 -0I85 to this application.
Oilluarttluriatlictian
For a leave to construct application that is tiled under section 92 of the Act, section 96 ofthe Act states that the Board shall consider the public interest and shall only consider the following two issues when
deciding if the proposed project is in the public interest: (.the interests of consumers with respect to prices and the reliability and quality of electricity service; and 2.where applicale and in a manner consistent
with the policies of the Government of Ontario, the promotion of the use of renewable energy sources. Environmental issues with respect to this project are considered through a separate process which is not
a part of this Board proceeding.
How to see the Application
To see u copy of the application, go to the Consumer page of the Board's website and enter the case number EB -2013-1047 in the "Find an Application" box. Copies of the application and the pre -filed
evidence in support of the application will also be available for public inspection at the addresses listed below and at www.Grandbend.Northlandpxnver.ca.
Written Hearing
The Board intends to proceed with this matter by way of a written hearing unless a party satisfies
written hearing in this matter, you must provide written reasons why an oral hearing is necessary
within 10 days of the publication or date of service on you of this notice.
mow to Participate
Comment
If you wish to give your opinion on the proceeding to the Board Members hearing the
application, you are invited to send a letter of comment to the Board no later than 30 days after
the publication or date of service on you of this notice. A complete copy of your letter of com-
ment, including your name, contact information, and the content of the letter, will be provided to
the Applicant and the Board Members hearing the application.
Observe •
If you do not wish to actively participate in the proceeding but you do wish to receive
documents issued by the Board, you may request observer status. Your written request must be
received by the Board no later than 10 days from the publication or date of service on you of
this notice. Personal Information in Letters of Comment and Observer Requests All letters of
comment and letters requesting observer status will he placed on the public record, which means
that the letters can be seen at the Hoard's offices and will he available on the Hoard's website.
Befiire placing the letters on the public record, the Board will remove any personal (i.e. not
business) contact information from the letters (i.e. the address, fax number, phone number, and
e-mail address of the individual). However, the name of the individual and the content of the
letter will become part of the public record. Please address your letter to the Board Secretary at
the address below, and reference file number EH -2013-0185 at the top of your letter.
Intervene
It' you wish to actively participate in the proceeding (e.g., submit questions, tile argument), you
may request intervenor status from the Board no later than 10 days after the publication or date
of service on you of this notice. Instructions for requesting intervenor status are available on the
Hoard's website at www.ontarioenergyboard.ca/participate. Everything an intervenor files with
the Board, including the intervenor's name and contact information, will be placed on the public
record, which can be seen at the Board's offices and will be available on the Board's website.
If you do not have internes access, please cull 1-888-632-2727 to receive information about this
proceeding and how to participate.
How to Contact Us
the Hoard that there is a good reason for not holding a written hearing. If you object to the Hoard holding a
. Any submissions objecting to a written hearing must be received by the Board and copied to the Applicant
Location Map
Grand Bond Wind Farm
Grand Rend Wind
timiNd Partnership
11
4
'l
i
1
1 170411 1,441,414$104 Ina
i
Grand Bond
I Un tarrrn••41
rewr•
---------
_ —v
TNa te/•♦1teUo11
011....11 •
--
--
--
roe
1
loun of Bluewnler.
7d4n el Soultl Huron
Mar
i
144x•,14
llwllcA,ard
e1
te,
oy0,eipe
Spy%h"•As'�'
.440
44)
1---,
'---: •...•u,
•'1 •.. ,.,.• I....
110
4,414.44. 4.11404
14.4.+4•1 4.4% L..••••...,..
•••,.,, ,,.
w. •- a w.
In responding to this notice. please reference Board file number EH -2013-0185 in the subject line of your e-mail or at the top of your letter. It is also important that you provide your name, postal address and
telephone niimber and, if available, an e-mail address and fax number. All communications should be directed 10 the attention of the Hoard Secretary at the address below, and be received no later than 4:45
p.m. on the required date.
IMPORTANT: 111 YOU IX) NOT FII.l? A WRITTEN SUBMISSION OBJECT-
ING TO A WRITTEN HEARING OR IX) NOT PARTICIPATE IN THE HEAR-
ING IN ACCORDANCE WITH THIS NOTICE, THE BOARD MAY PROCEED
WITHOUT YOUR PARTICIPATION ANI) YOU WILL. NO'r Bli ENTITLED TO
FURTHER NOTICE IN THIS PROCEEDING.
DATED at Toronto May 10, 2013
ONTARIO ENERGY BOARD
Original Signed Hy Kirsten Walli, Board Secretary
The hoard
Ontario Energy Board
PO. Box 2319
27th Floor
230() Yonge Street
Toronto ON M41' 1 14
Attention: Board Secretary
Filings: www.pesanitarioenergyboard.ca/eservice/
t? mail: bwardsec@ontarilenergybxmrd ca
Tel: 1-888-632-6273 (Toll tree)
Fax: 416-440-7656
Addresses:
The Applicant
Grand Bend Wind Limited Partnership
311 St. Clair Ave. West, Suite 1700
Toronto, Ontario, M4V 3A 1
Attention: Mr. Gordon Potts
Tel: (647) 288-1223
Fax: (416) 962-6266
Email: gpotts@northlandpowerca
CounselfuLtkt Apulicuut
Borden Ladner Gervais I I I'
Scotia Plain, 40 King Sticct Nest
Toronto, Ontario, M5H 3Y4
Attention: Mr. James C. Sidlofsky
"rel: (416) 367-6277
Fax: (416) 361-2751
jsidlofsky@blg.com