Loading...
Lakeshore Advance, 2013-06-05, Page 16Wednesday, June 5, 2013 • Lakeshore Advance 15 NOTICE OF APPLICATION AND WRITTEN HEARING GRAND BAND WIND LIMITED PARTNERSHIP APPLICATION FOR LEAVE TO CONSTRUCT TRANSMISSION FACILTIES TO CONNECT A WINDFARM GENERATION PROJECT TO THE ONTARIO TRANSMISSION SYSTEM Ontario Energy Hoard EB -2013-0185 Commission de I'cnergie de ('Ontario Grand Bend Wind Limited Partnership (the "Applicant") has filed an application with the Board, dated April 19, 2013, under sections 92 of the Ontario Energy Hoard Act, 1998. The Applicant is a limited partnership constituted under the laws of the Piovince of Ontario. The Applicant general partner is Grand Bend Wind GP Inc. (the "Applicant General Partner") which is currently owned by Northland Power Inc. The Applicant is constricting a I00 MW wind -powered electricity generation facility in the vicinity north of the Town of Grand Bend (the Generation Project") which is subject to an Ontario Power Authority Feed -in Tariff contract. In order to connect the Generation Project to the Ontario transmission system, the Applicant is planning to constnict the following facilities which are the subject of this Application: • a substation which will step up the voltage of the Generation Project collector system from 34.5 kV to 230 kV; • a 230 kV single -circuit underground transmission line, approximately 30 km in length, to connect the Generation Project to the existing Hydro One transmission system circuit 13231) located approximately 3 km South East of Hydro One's Seaforth TS; • a switching station at the point of connection with the Hydro One transmission system near Seaforth TS. A map showing the location of the proposed facilities is included with this Notice. The transmission line is entirely contained within municipal road rights-of-way to minimize its impact on private property. with the exception that some private property will be crossed at each end of the transmission line. The Applicant has acquired easements through the affected parcels of private land. The Transmission Facilities will be owned by the Applicant and be paid for by the Applicant or its affiliates/partners. The Hoard has assigned file number EB -20I3 -0I85 to this application. Oilluarttluriatlictian For a leave to construct application that is tiled under section 92 of the Act, section 96 ofthe Act states that the Board shall consider the public interest and shall only consider the following two issues when deciding if the proposed project is in the public interest: (.the interests of consumers with respect to prices and the reliability and quality of electricity service; and 2.where applicale and in a manner consistent with the policies of the Government of Ontario, the promotion of the use of renewable energy sources. Environmental issues with respect to this project are considered through a separate process which is not a part of this Board proceeding. How to see the Application To see u copy of the application, go to the Consumer page of the Board's website and enter the case number EB -2013-1047 in the "Find an Application" box. Copies of the application and the pre -filed evidence in support of the application will also be available for public inspection at the addresses listed below and at www.Grandbend.Northlandpxnver.ca. Written Hearing The Board intends to proceed with this matter by way of a written hearing unless a party satisfies written hearing in this matter, you must provide written reasons why an oral hearing is necessary within 10 days of the publication or date of service on you of this notice. mow to Participate Comment If you wish to give your opinion on the proceeding to the Board Members hearing the application, you are invited to send a letter of comment to the Board no later than 30 days after the publication or date of service on you of this notice. A complete copy of your letter of com- ment, including your name, contact information, and the content of the letter, will be provided to the Applicant and the Board Members hearing the application. Observe • If you do not wish to actively participate in the proceeding but you do wish to receive documents issued by the Board, you may request observer status. Your written request must be received by the Board no later than 10 days from the publication or date of service on you of this notice. Personal Information in Letters of Comment and Observer Requests All letters of comment and letters requesting observer status will he placed on the public record, which means that the letters can be seen at the Hoard's offices and will he available on the Hoard's website. Befiire placing the letters on the public record, the Board will remove any personal (i.e. not business) contact information from the letters (i.e. the address, fax number, phone number, and e-mail address of the individual). However, the name of the individual and the content of the letter will become part of the public record. Please address your letter to the Board Secretary at the address below, and reference file number EH -2013-0185 at the top of your letter. Intervene It' you wish to actively participate in the proceeding (e.g., submit questions, tile argument), you may request intervenor status from the Board no later than 10 days after the publication or date of service on you of this notice. Instructions for requesting intervenor status are available on the Hoard's website at www.ontarioenergyboard.ca/participate. Everything an intervenor files with the Board, including the intervenor's name and contact information, will be placed on the public record, which can be seen at the Board's offices and will be available on the Board's website. If you do not have internes access, please cull 1-888-632-2727 to receive information about this proceeding and how to participate. How to Contact Us the Hoard that there is a good reason for not holding a written hearing. If you object to the Hoard holding a . Any submissions objecting to a written hearing must be received by the Board and copied to the Applicant Location Map Grand Bond Wind Farm Grand Rend Wind timiNd Partnership 11 4 'l i 1 1 170411 1,441,414$104 Ina i Grand Bond I Un tarrrn••41 rewr• --------- _ —v TNa te/•♦1teUo11 011....11 • -- -- -- roe 1 loun of Bluewnler. 7d4n el Soultl Huron Mar i 144x•,14 llwllcA,ard e1 te, oy0,eipe Spy%h"•As'�' .440 44) 1---, '---: •...•u, •'1 •.. ,.,.• I.... 110 4,414.44. 4.11404 14.4.+4•1 4.4% L..••••...,.. •••,.,, ,,. w. •- a w. In responding to this notice. please reference Board file number EH -2013-0185 in the subject line of your e-mail or at the top of your letter. It is also important that you provide your name, postal address and telephone niimber and, if available, an e-mail address and fax number. All communications should be directed 10 the attention of the Hoard Secretary at the address below, and be received no later than 4:45 p.m. on the required date. IMPORTANT: 111 YOU IX) NOT FII.l? A WRITTEN SUBMISSION OBJECT- ING TO A WRITTEN HEARING OR IX) NOT PARTICIPATE IN THE HEAR- ING IN ACCORDANCE WITH THIS NOTICE, THE BOARD MAY PROCEED WITHOUT YOUR PARTICIPATION ANI) YOU WILL. NO'r Bli ENTITLED TO FURTHER NOTICE IN THIS PROCEEDING. DATED at Toronto May 10, 2013 ONTARIO ENERGY BOARD Original Signed Hy Kirsten Walli, Board Secretary The hoard Ontario Energy Board PO. Box 2319 27th Floor 230() Yonge Street Toronto ON M41' 1 14 Attention: Board Secretary Filings: www.pesanitarioenergyboard.ca/eservice/ t? mail: bwardsec@ontarilenergybxmrd ca Tel: 1-888-632-6273 (Toll tree) Fax: 416-440-7656 Addresses: The Applicant Grand Bend Wind Limited Partnership 311 St. Clair Ave. West, Suite 1700 Toronto, Ontario, M4V 3A 1 Attention: Mr. Gordon Potts Tel: (647) 288-1223 Fax: (416) 962-6266 Email: gpotts@northlandpowerca CounselfuLtkt Apulicuut Borden Ladner Gervais I I I' Scotia Plain, 40 King Sticct Nest Toronto, Ontario, M5H 3Y4 Attention: Mr. James C. Sidlofsky "rel: (416) 367-6277 Fax: (416) 361-2751 jsidlofsky@blg.com