HomeMy WebLinkAboutLakeshore Advance, 2011-11-23, Page 23146("SWEI"""""nity Van Osch goes In for a scoring drive the third pe
St. Anne's goalie Stephanie Slays stops a strong Panthers attack.
Kasaldy Eckert, right, sets up a play behind South Huron's net.
Wednesday, November 23, 2011 • Lakeshore Advance 23
Yetis Down Clinton News Record
Home opener
The St. Anne's girls' hockey team opened their season against South Huron last
Thursday at the Eastlink Arena. The Panthers started off strong, scoring three goals
In the first period. Despite netting two quick goals at the start of the third, the Eagles
couldn't fend off the Panthers, and lost the game 6-2. St, Anne's goals were scored by
Kassidy Eckert and Lexi Smith.
t 1 111 i t"l'
HIGHWAY 21 CORRIDOR SANITARY SEWAGE COLLECTION SYSTEM
CLASS ENVIRONMENTAL ASSESSMENT (EA) & PEI.IMINARY DESIGN
Notice of Completion
On November 3, 2011, the Municipality of Rluewater Council adopted the Environmental
ntal
Screening Report prepared for the proposed Highway 21 Corridor Sanitary Sewage Collection
System. 'the Service Area for the collection system is shown on the roup. The collection system
consists of the following components:
• a for'emain located in an easement along the east side of Highway 21
• a low pressure sewage collection system servicing all of the subdivisions in the Lakeshore
Service Area. The system will be constructed in four phases from the south to the north.
•
.n.
itioaktemi M M11 sir.I Nom• 11 ,•.�
L AMI F AAO 4Y r..'. v....
11M 1111Womme.1.0s0 /ft
...«.y M * n,.
Ofauliour
.t
Since the preliminary municipal and per lot cost estimates prepared for the proposed collection
system are high, the Environmental Screening Report recommends that the system not be con-
structed until Provincial Government funding is available. the Municipality intends 10 use the
report as the basis for seeking funding.
The ('lass EA completed fur this project followed the requirements of the Municipal ('lass EA
(2(111, as amended) for a Schedule "R" project, as dtx•unlented in the Environmental Screen-
ing Report. A copy of the report is available for a 30 -day review period from November 23 to
December 21, 2011 at:
Municipality of Rluewater
14 Mill Avenue. P.O. Box 250
Zurich, Ontario. NOM 2111
519-236-4351
Hours: Monday to Friday, 8:10 a.m. to 4:30 p.m.
'the report is also available on the Municipality's website ,tt www.town.hluewater.on.ca.
The Municipal ('lass EA entitles any person who has significant concerns about the project to
request the Minister of the Environment to issue a part 11 Order to change the status of the project
from a ('lass EA to an individual environmental assessment. The procedure for requesting a Part
11 Opfer is:
• lirst, the person with concepts discusses them with the Municipality of Rluewater
• if the concerns cannot be resolved, the person may submit a written request for a Part 11
Order to the Minister of the Einvimnntent at 135 St. ('lair Avenue West, 12th Floor, Toronto,
Ontario, M4V 1 P5 by December 23, 2011, copied to Brent Kittmer, Utilities Superintendent.
Municipality of Rluewater, 14 Mill Avenue. P.O. Rot 250, Zurich, Ontario. NOM 210.
Ilio hired, 'n, 1'1 ,n/i'o,, intnl rind I'rntrrtu'n elf 1',,t,: art apphos to mliunxntrm t;alheieti kit Ihe., rte, t
With the etcepNuat rel personal inlixtmttion, all continent. \vitt hetumc pant rpt the public ntivatl.
MAIj.( WiIF,
PC( (111NC SIMierr'i�/rr.v
4 4111.1 rl ctrl /i►r ' 11111I'Ilrrt.
�r \' 1 tititi .'.•"2_9 1 i 1