Loading...
The Rural Voice, 1987-04, Page 20NOTICE OF APPROVAL TO PROCEED The Joint Board has given Ontario Hydro approval to proceed with a set of facilities in the above matter. These facilities, consisting of high voltage transmission lines and a transformer station, are known as System Plan 1 (modified) all as set out in the map below. Port Ektn NPOCE/ Lake l Ninon World wird Abe Cray Strathre, • SITE N V Worgow asp Chauwonh Cean,a ood M.M.I. ESSA TS le •••• 'Hanover 'Ds unda�uuun� > Walkerton •Sh.ibnn• • SYSTEM PLAN 1 Won • E..t•r London • c Guelph Sime oe T,Knonourd Pori DO.r St Thomas Lake MILT TS Lek. Ontario .MID OLEPORT TS tR NANTtCbKE Eno Copies of the decision may be obtained at the following repositories: ■ Ontario Hydro's head office (Public Reference Centre) 700 University Ave., Toronto, Ont. • Ontario Hydro's regional offices at: 93 Bell Farm Road Barrie, Ont. 5760 Yonge St. Toronto, Ont. 1075 Wellington Road South London, Ont. Hearing No. CH -85-03 Dated at Toronto this 4th day of March 1987 Yvonne Lane Hearings Registrar Office of Consolidated Hearings 1 St. Clair Avenue West, 5th Floor, Toronto, Ontario M4V 1K7 (416) 323-4814 18 THE RURAL VOICE