HomeMy WebLinkAboutThe Lucknow Sentinel, 1986-01-29, Page 4Page 4—Lecknow Sentinel, Wednesday, January 29, 1986
MEElk A1113=1
Ontario
IN THE MATTER OF the Consolidated Hearings Act, 1981, (S.O.
1981, c. 20);
AND IN THE MATTER OF the Environmental Assessment Act,
(R.S.O. 1980, c. 140);
AND IN THE,MATTER QF Sections 6, 7 and 8 of the Expropriations
Act, (R.S.O. 1980, c. 148);
AND IN THE MATTER OF the Niagara Escarpment Planning and
Development Act (R.S.O. 1980, c. 316);
AND IN THE MATTER OF the Parkway Belt Planning and
Development Act, (R.S.O. 1980, c. 368);
AND IN THE MATTER OF an undertaking 01 Ontario Hydro
consisting of the acquisition of property rights for, and the design,
construction, operation and maintenance of overhead alternating
current transmission lines, and related station, communication
and control facilities, located within a geographic area (identified
on the study area map included in this notice):
Between the Bruce Nuclear Power Development, near
Kincardine and the Essa Transformer Station, near Barrie:
Between the Bruce Nuclear Power Development and a new
transformer station to be built in the London area; and
Between the new transformer station in the London area and
the Nanticoke Generating Station, on Lake Erie.
NOTICE OF CONTINUING PUBLIC HEARINGS
AT REGIONAL LOCATIONS
(LOCAL PUBLIC HEARINGS)
ONTARIO HYDRO TRANSMISSION SYSTEM
EXPANSION PROGRAM
THE JOINT BOARD IS CONDUCTING PUBLIC HEARINGS TO CONSIDER THE
APPROVAL OF, AND IF APPROVED, THE LOCATION OF ONTARIO HYDRO'S
PROPOSED TRANSMISSION FACILITIES BETWEEN:
• THE BRUCE NUCLEAR POWER DEVELOPMENT, NEAR KINCARDINE, AND THE
ESSA TRANSFORMER STATION, NEAR BARRIE;
• THE BRUCE NUCLEAR POWER DEVELOPMENT AND A NEW TRANSFi,SRMER
STATION TO BE BUILT iN THE LONDON AREA: AND
• THE NEW TRANSFORMER STATION IN THE LONDON AREA AND THE
NANTICOKE GENERATING STATION, ON LAKE ERIE.
AND TAKE NOTICE THAT IF YOU DO NOT ATTEND AT THE HEARINGS, THE
JOINT BOARD MAY PROCEED WITH THE HEARING IN YOUR ABSENCE AND
YOU WILL NOT BE ENTITLED TO ANY FURTHER NOTICE 1N THE PROCEEDINGS.
AND TAKE NOTICE THAT LANDS WITHIN THE SHADED AREAS SET OUT IN THE MAPS BELOW MAY BE EXPROPRIATED FOR ANY
FACILITIES WHICH MAY BE APPROVED.
THE PROPOSAL
Ontario Hydro is proposing a major expansion of its bulk electricity transmission
system. This would involve constructing new transmission lines, a new London area
transformer station and related facilities. The' recommended location and acceptable
alternative locations are shown on the maps in this notice.
Hearings before the Joint Board commenced in Guelph in November, 1985. Notice ,of
the commencement of the hearings was given by publication in September, October,
and November, 1985, and by mail in September, 1985. The notice of commencement
of the hearings advised of the intention to schedule as part of the hearing process
future local hearings for the convenience of the public to deal with certain aspects of
the undertaking.
All evidence on transmission routes and transformer station location will be given at
the respective local hearings. All other evidence is being' given at the main hearing
locations in Guelph. Such evidence is now being presented at the 'Holiday Inn on
Stone Road. •
Following the local hearings, the hearing will continue in Guelph to hear further
evidence on the recommended transmission system and alternative transmission
systems.
Any person:
(a) in support or in opposition to Ontario Hydro's recommended or acceptable
alternative routes; or
(b) who wishes to propose a deviation or alternative route to either the
recommended or acceptable. alternative routes
is invited to make submissions or otherwise •participate in the local public hearings.
in addition., any person who has,not participated to date in the hearings conducted in
Guelph, which have so far dealt with, general aspects of the- undertaking, is invited to
make submissions at the Local public hearings with respect to any matter that is
relevant to the undertaking. In so doing such person may give evidence and/or make
submissions and/or call his or her own witnesses to -give evidence.
If you wish to make a submission at any of these locations and have not already
notified the' Board it would be of assistance to the Board if you would write or call Ms.
Yvonne Fernandes, Hearings Registrar, at the address below.
DATES AND. LOCATIONS FOR
LOCAL PUBLIC HEARINGS
FEBRUARY 18,1996 AT MARKDALE
To deal with facilities between the Bruce Nuclear Power Development and the Essa
Transformer Station and such other matters as may be relevant as determined by the
Joint Board.
AT: Centre Grey Recreation Complex,
Markdale
COMMENCING AT: 10:00 a.m. on February 18, 1986
MARCH .19,1906 AT LONDON
To deal with facilities including a new transformer station in the London area and such
other matters as may be relevant as determined by the Joint Board.
AT: Holiday Inn, London City Centre Complex
300 King Street
London •
COMMENCING AT: 10:00 a.m. on March 18, 1986
APRIL 15,1986 AT CLINTON
To deal with facilities between the Bruce Nuclear Power Developrnent and the Landon
Area and such other matters as may be relevant as determined by the Joint Board.
AT: Clinton Town Hall
23 Albert Street Clinton
COMMENCING AT: 10:00 a.m. on April 15, 1986
MAY 13, 1986 AT SiMCOE
To deal with facilities between the London area and the Nanticoke Generating. Station
and such other matters as may berelevant as determined by °the Joint Board.
AT: Minden Manor Motor inn,
385 Oueensway. West. Simcoe
(Wellington Room)
COMMENCING AT: 10:00 a.m.. on May 13, 1986
DETAILED MAPS. SHOWING LINE LOCATIONS
Detailed maps (1:15,000) showing the recommended and acceptable alternative 10 -
cations as they may affect yotl in your local area are available for review at your
township, county and local Ontario Hydro area offices.
TRANSCRIPTS POR THIS HEARING
Transcripts are being distributed to various libraries arid Ontario Hydro offices, infor-
mation on the specific locations is available from the He! it•ing's Registrar whose ad-
dress and teleDhdne number ate listed below.
Hearing No. C 1-es-oa
Dated at Taranto
this Arid day; c f January,186
•
Yonne. Fernandes
HeatingS registrar •
Offite of Consolidated Hesi°ings
1 St Clair Avenue West
5th fItol
Toronto, Ontario
M4V1K7
(416) 985
Map of Bruce to Essa Recommended
and Acceptable Alternative Facilities
Owen Sound Georgian Bay
Chatsworth Collingwood
Lake Huron
Port Elgin
•
Bruce
NPD
Paisley
Walkerton
•
Hanover
Recommended Route
Acceptable Alternative Route'
Dundalk
Barrie
Essa TS
Alk,n
Map of Bruce to New London
Area TS Recommended
and Acceptable Alternative
Facilities
Bruce
NPD
Lake
Huron
Kincardine
Walkerton
•
Shelburne
Map of New London Area TS To Nanticoke
Recommended and Acceptable Alternative Facilities
..ter. Recommended Route
.,� �..., Acceptable Alternative Route
Wa erloo
•
Kitchener!'
Wingham
Godench
Clinton
Bayfield
PAO
Mit
Pfs*
or
PLEASE
NOTE
THE JOINT BOARD MAY CONSIDER FOR APPROVAL THE RECOMMENDED LOCATION OR ANY OF THE ALTERNATIVE
LOCATIONS OR ANY OTHER LOCATION WITHIN THE STUDY AREA. THE.DECIS(ON RESULTING FROM THIS HEARING
WILL DETERMINE THE LOCATION OF ANY TRANSMISSION LINES, THE NEW LONDON AREA TRANSFORMER STATION.
AND OTHER FACILITIES WHICH MAY BE APPROVED. AND YOUR LAND MAY BE EXPROPRIATED FOR THESE FACILmES
AS A RESULT OF THE JOINT BOARD'S DECISION.
AilsaCraig
Strathroy
Recommended
TS Site (Site N)
4Cri
Indian Rese-ries
St, Thomas
1 AL
Lake Erie
Recommended Route
ams moo Acceptable Alternative
• Route
Study Area Map The shaded area on this map shows the approximate study area.
Lake Huron
Port Elgin
Bruce
NPO
Kincardine
Godench
Bayfield
Aitsa Craig
Stralhroy
Site N
Chatsworth
Georgian
\aY Cotlingwood
Stayner
Essa TS
• Hanover Dunda
Walkerton
Clinton
Yip
Wingham
Kitchener
•
Exeter
WoodslOck
London
Alliston
Shelburne
Guelph apt
•
,Cambridge
y
micoe'
Tiitsonburg
St. Thomas
Lake Etie
Milton TS
Middleplrt TS
Nanticoke ,,,,,I-
GS
fort Dover
Site bi
i'iecommended Site
tor the new London
area Transformer Station
-Legend'
i GS Generating Statin?.
TS • Transformer Station
t'`1PD t lud'ear Pourer Development
StudyArea
�eu.�ei i a I1econirbended Routes
smosioirus Acceptable AlteTnatfve'Itotttes