HomeMy WebLinkAboutThe Lucknow Sentinel, 1989-03-22, Page 8Page 8 --Lucknow Sentinel, Wednesday, March 22, 1989
The Corporation Of The
Village of Lucknow
NOTICE OF APPLICATION
By the Corporation of the Village of Lucknow for approval of the corietructIon of certain Sewage Works and the issuance of debentures as set out below and for approval of the enactment of
a proposed By -Law imposing a Sewer Rate
TAKE NOTICE THAT:
1. The Council of The Corporation of the Village of Lucknow intends to apply to The Ontario Municipal Board for approval of:
(a) the construction of Sewage works as described in Schedule "A" annexed hereto at an estimated cost of $5,406,190.00. After allowing for a Provincial Government grant of $4,520,882.00,
the sum of $885,308.00 shall be raised by the sale of debentures payable over a period not exceeding ten (10) years. The Corporation intends to charge the whole cost of the works as
a sewer rate for a period not exceeding ten (10) years upon the owners or occupants of lands who will or may derive a benefit therefrom, and
(b) the passing of a proposed by-law to impose such sewer rate to raise the whole of the annual payments on such debentures, consisting of:
(i) a frontage rate annually of $1.65 per'foot ($5.40 per metre) for ten (10) years.
2. The following is an example of a typical charge:
Description
Typical property with 66 feet
(20.117 metres) frontage
(a) Frontage charge
(b) Service connection charge from the
sewermain to the property line
(c) Sewer Service Rate
Total s
*Plus Annua Ily
A Sewer Service Rate of 1.45 times the water bill. For a typical property this would be; Sewer Service Rate = 1.45 x $96.00 = $139.20 per year
3. The following exemptions will be granted:
(a) In the case of corner lots situated at the junction or intersection of streets or highways,. 100 feet (30.48 metres) of the flankage is exempt from the frontage rate.
(b) Triangular or irregularly shaped lots alai either experience an Increase in the metre frontage rate or a decrease in same on a bans that is deemed toThe equitable and lush.
Commuted (Up -front) Charge Annual Charge (for 10 years)
66 x $9.30 = $613.80 66 x $1.65 = $108.90
750.00
$1363.80*
132.75
1.45 x 96' = 139.20
$380.85
(c) Where a lot is for any reason wholly or in part unfit for building purposes, a reduction may be made in the frontage rate that otherwise would be chargeable thereon, sufficient to adjust
its frontage charge as compared with that of lots fit for building purposes on a fair and equitable basis.
(d) In the case of lots that because of the nature of the terrain or the elevation of the sewer do not derive the same benefit as other lands fronting or abutting on the sewer, a partial exemption
from the frontage rate may be made, having regard to the benefit derived as compared with other lots, sufficient to adjust the frontage charge on a fair and equitable basis.
(e) Any changes that are required to be made by the application of paragraphs (a) to (d) herein shall be made by deducting from or adding to the total frontage of the lot which is subject to
the metre rate so that the whole of the lot is charged on a basis that is equitable and just.
4. Any ratepayer may, within twenty-one days after the date of the publication or mailing of this notice, whichever is later, serve personally or by Registered mail on the Clerk of the Village of
Lucknow, at the address given below, a notice in writing stating objection to the approval of the construction of said works or to the imposition of the special rate, and the grounds of such objection
and that if a public hearing is held, the objector or representative will attend such hearing to support such objection.
5. The Ontario Municipal Board may approve of the construction of the said works and the issuance of the said debentures, and the imposition of the said sewer rate, but before doing so it may
appoint a time and place for a public hearing when any objections will be considered, but notice of such hearing will be given only to those persons who have given notice of objection as
provided for above.
DATED at the Village of Lucknow, this 15th day of March, 1989.
THE LAST DATE for diling of objections is the 14th day of April, 1989.
BY-LAWS MAY BE INSPECTED AT THE OFFICE OF THE CLERK DURING REGULAR BUSINESS HOURS.
Bertha Whitcroft, Clerk Treasurer
Village of Lucknow
Box 40, LUCKNOW, Ontario, NOG 2H0
SCHEDULE "A" LUCKNOW SANITARY SEWAGE WORKS DESCRIPTION
1.0 SANITARY SEWERS
STREET OR EASEMENT
Napier Street
William Street
Ludgard Street
Gough Street
Rose Street
Rose Street
Hamilton Street
Hamilton Street
Wheeler Street
Hays Street
Wolsley Street
Campbell Street
Campbell Street
Easements on North
Side :of Campbell St.
Easements on South
Side of Campbell St.
Willoughby Street
Stauffer Street
EXTENT OF SERVICING
- From Ludgard Street to 180 m
North of Ludgard Street
- From Ludgard Street to 137 m
North of Ludgard Street
- From Delhi Street to Napier Street
- From 70 m West of Inglis Street
to 152 m East of Havelock Street
- From Inglis Street to 137 m
East of Havelock Street
- From Stauffer Street to 223 m
West of Stauffer Street
- From Inglis Street to 116 m
East of Havelock Street
- From Stauffer Street to 219 m
West of Stauffer Street
- From Victoria Street to 85 m
East of Havelock Street
- From Delhi Street to 104 m
East of Delhi Street
- Havelock Street to 183 m
East of Havelock Street
- From the Westerly Village Limit
to Ross Street
- Havelock Street to Easterly
Village Limit
- From Stauffer Street to 50 m
West of Havelock Street
- From Ross Street to 40 m
West of Havelock- Street
- From floss Street to Bob Street
- From Ludgard Street to Campbell Street
STREET OR EASEMENT
Havelock Street
North Delhi Street
Inglis Street
Outram Street
Victoria Street
Albert Street
Ross Street
Palmerston Street
Clyde Street
Canning Street and Easement
South Delhi Street
Bob Street
Elgin Street
Elgin Street
Walter Street
Right -of -Way
Easement on Mill Site No. 3
Easement on Mill
Site No. 2
Easement on Lots
511 and Farm Lot 14
EXTENT OF SERVICING
- From 220 m North of Ludgard Street
to Canning Street
- From Gough Street to Ludgard Street
- From Elgin Street to Gough Street
From Willoughby Street to Gough Street
- From Campbell Street to 60 m
North of Hamilton Street
- From Campbell Street to Wheeler Street
- From the Southerly Village Limit
to Campbell Street
a. - From 113-m West of Ross Street
to 85,m South of Canning Street
- From Ross Street to Canning Street
- From Ross Street to Havelock Street
- From 162 m East of Bob Street to
158 m West of Bob Street
- From Campbell Street to Delhi St.
- From Havelock Street to 107 m
East of Havelock Street
- From Bob Street to 158 m West
of Bob Street
- From Campbell Street to 184 m
North ofCampbell Street
- From Ross Street to 116 m West
of Ross Street
- From Clyde Street to Inglis Street
- From Campbell Street to
Willoughby Street
- Ross Street to 60 m West of
Ross Street
2.0 PUMPING STATION AND FORCEMAIN
A custom built sanitary sewage pumping station with standby power facilities and all appurtenances on Block "P" of Mill Site No. 3.
FORCEMAIN LOCATION
STREET OR EASEMENT
Inglis Street
Willoughby Street
Bob Street
Campbell St. and Highway No. 86
Washington Street
Alfred Street
Access Road for Treatment Site
Total length of forcemain - 2600 m+
Note: Alternative forcemain route is across
-FROM
Pumping Station
Inglis Street
Willoughby Street
Bob Street
Highway No. 86
275 m North of Highway No. 86
275 m North of Highway No. 86
Lot 64, Concession 1, Township of Kinloss
TO
Willoughby Street
Sob Street
Campbell Street
Kinloss Twp. St. 375 m East of Bob Street
275 m North of Highway No. 86
Line between Lots 54 and 56, Con. 1, Kinloss
Inlet works at Treatment Facility
3.0 TREATMENT AND DISPOSAL FACILITIES
A sewage treatment and disposal facility to be located on parts of the south half of Lots 63, 54, and 56, Concession 1, Township of Kinloss, generally consisting of:
-- 3 cell aerated lagoon sized for 36 days retention at average flow (1.2 ha surface area)
— 1 cell .emergency holding lagoon, sized for 90 days retention at average flow (3.6 ,ha surface area)
— rapid infiltration basin sized for discharging whole village flow In 275 days (1,000 m3/d).
including all .structures, piping; ::site work, access road, and other related facilities.