Loading...
Clinton News Record, 2013-12-25, Page 1414 News Record • Wednesday, December 25, 2013 NExTera' ENERGY CANADA NOTICE OF CHANGE TO A RENEWABLE ENERGY PROJECT Project Name and OPA Number: Bluewater Wind Energy Centre, F -002171 -WIN -130-601 Dated at Municipalities of Bluewater and Huron East, Huron County this December 24th, 2013 Project Location: The proposed Project is located in Huron County, within the Municipalities of Bluewater and Huron East, as shown in Figure 1 below. Varna Wind, Inc., a wholly-owned subsidiary of NextEra Energy Canada, ULC, received a Renewable Energy Approval for the Bluewater Wind Energy Centre on April 22, 2013. The proposal to engage in the project and the project itself is subject to the provisions of the Environmental Protection Act (ACT) Part V.0.1 and Ontario Regulation 359/09 (Regulation). This notice is being distributed at the request of the Ministry of the Environment (MOE) to advise of recent modifications proposed to the Project design. The following list highlights the proposed modifications. • Construction disturbance area modified to reduce or eliminate impacts to Conservation Authority regulation limit; • Infrastructure or construction disturbance area added or changed to optimize project design/constructability; and, Changes to REA Conditions of Approval E1. (2) a) and b) and E2. (1) and (2) regarding the timing of and conditions associated with conducting and submitting the Acoustic Audit Report-Immission to reflect NextEra's experience and to be consistent with conditions issued in more recent REAs. Project Modification Reports in addition to Addenda to the associated Renewable Energy Approval Reports are available for public inspection on the Project Website, www.NextEraEnerqyCanada.com. -=ntral Fiurs,n FYUTOn EasI Figure 1 - Project Location 9.1.416249h '."e3L Ia r411 5l1u4i°sYa143r Do., y46114. AEr+c h Nan Project Contact and Information: Derek Dudek Community Relations Consultant Varna Wind, Inc. 390 Bay Street, Suite 1720 Toronto, ON M5H 2Y2 PcojModsNotice_Clintn 122013.indd 1 To learn more about the project or to communicate concerns, please contact: Toll-free Project Line: 1-877-257-7330 E-mail: Bluewater.Wind@NextEraEnergy.com Website: www.NextEraEnergyCanada.com 12/18/2013 5:54:50 PM