Loading...
HomeMy WebLinkAboutHuron Expositor, 2015-01-21, Page 1010 Huron Expositor • Wednesday, January 21, 2015 Dave Flaherty Huron Expositor The first annual MILPS (Moms I'd like to Party With) Gala held in Seaforth on Sat., Jan. 17 was a rousing success, drawing 200 people. The evening featured music by Jay Allen, a catered dinner by High Creek Farm, a fashion show curated by the owners of Scarlet in Exeter and a show by hypnotist comedian Hank Stone. The evening, hosted by the Huron East Centenaires, finished off with a dance party. MUNICIPALITY OF HURON EAST fT6. r ..473,1.1 CLASS ENVIRONMENTAL ASSESSMENT FOR \ f` REPLACEMENT OF STRUCTURE M58 1.11 Liiic COMMENT INVITED THE PROJECT: The Municipality of Huron East is planning to replace Structure M58 on Beechwood Line, located approximately 6 km northeast of Seaforth, spanning the Woods Municipal Drain, a tributary of the Maitland River (as shown on the accompanying key plan). Recent engineering inspections of the structure have identified advanced deterioration with primary bridge components. Repair of the structure is not considered practical at this time due to the narrow width and the extent of structural deterioration evident during the inspection process. The Municipality is considering two options to replace the structure. The first involves replacing the crossing with a concrete box culvert in the same location as the existing structure. The second alternative involves replacing Structure M58 and Structure M60 with one larger culvert in a slightly modified location. Structure M60 is also in need of replacement and is located in very close proximity to structure M58 making it a viable option to consider in conjunction with this project. THE ENVIRONMENTAL SCREENING PROCESS: The planning for this project is following the planning process established for Schedule B activities under the Municipal Class Environmental Assessment (Class EA) document. Schedule B projects are approved subject to a screening process. The purpose of the screening process is to identify any potential environmental impacts associated with the proposal and to plan for appropriate mitigation of any impacts. The process includes consultation with the public, stakeholders and review agencies. This notice is being issued to advise of the start of study investigations. There will be additional opportunities for public input and involvement as the study progresses. PUBLIC INVOLVEMENT: Public input and comments are invited for incorporation into the planning and design of this project and will be received until February 20th, 2015, at the address listed below. Any comments collected in conjunction with the study, will be maintained on file for use during the project and may be included in project documentation. With the exception of personal information, all comments will become part of the public record. For further information on this project, or to review the Municipal Class EA process, please contact the project engineers: B.M. Ross and Associates: 62 North Street, Goderich, Ontario, N7A 2T4. Telephone (519) 524-2641. Fax (519) 524-4403. Kelly Vader, Environmental Planner (e-mail: kvader@bmross.net). Barry Mills, Public Works Manager Municipality of Huron East This Notice issued January 21, 2015